Luke Fisher

Bridges Director, Spencer Group

Luke is the Bridges Director for Spencer Bridge Engineering Limited, responsible for leading the design and construction teams on complex bridge refurbishment projects across the UK. He specialises in metallic structures and has been involved in a number of refurbishment schemes on long span and/or historical structures, such as Humber, Erskine, Kessock, Union Chain and Menai Bridges.

My Speaker Sessions

Wednesday 13 March 2024

12:20

Closure of Menai Suspension Bridge: the Issue, Emergency Works, and Permanent Solution

12:20 - 12:45
  • Following a reduction to a 7.5t weight limit on the Menai Suspension Bridge in 2022, further analysis of the hangers was undertaken on Telford’s iconic structure to identify how failure of an individual hanger socket would affect the structural integrity of the whole bridge.

  • This revealed that the majority of load would transfer into adjacent hangers and for all traffic load models had the potential to cause catastrophic failure of the entire deck.

  • This talk discusses the details of the project, including the analysis, temporary works solution employed to re-open the bridge, and details of the new permanent hangers currently being manufactured in Switzerland.